Copper Canyon / Chihuahua Pacifico Railroad - EngineerPhotos by Jeff Robbins, Peter Arnold and Stan HustonFebruary 2002 |

| The rail trip from Los Mochis to Chihuahua has 36 major bridges and 87 tunnels along 300 miles of track. It follows a tortuous route from sea level to about 8000 feet at its maximum elevation. |